Smart City Information System Demo Sites

PITAGORAS Site Kremsmünster

*Disclaimer: The pilot plant proposed to be installed at the demo site of Kremsmünster (Austria) is no longer planned. Although the oil and gas company in which the pilot plant was going to be built confirmed their interest on the solar project and the main aspects on the heat delivery contract were in fact agreed between the ESCO (Energy Service... Continue reading
SCIS Clusters : Demonstration projects, Energy System Integration, Large Scale Energy Systems – Heating & Cooling
Projects: PITAGORAS
EU-GUGLE Site Aachen

EU-GUGLE Site Aachen

The City of Aachen has 248.000 inhabitants and is situated at the western border of Germany to Belgium and the Netherlands. It is a very important place for science and education with more than 50.000 students in total. The district Aachen-North is a heterogeneous area with a mixture of recent and ancient industrial and residential buildings. Due... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE
 EU-GUGLE Site Bratislava

EU-GUGLE Site Bratislava

Bratislava is the capital of Slovakia and the country’s largest city with a population of about 420,000. Bratislava is the political, cultural, and economic centre of Slovakia. Its area is 36 759 ha. The population density is 1,161 inhabitants per km2 (2007). Located in the south-western Slovakia, Bratislava is occupying both banks of the Danube... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE
EU-GUGLE Site Milano

EU-GUGLE Site Milano

Milano, the second-largest city in Italy and the capital of Lombardy has a population of about 1.35 million people. The city urban area is the fifth largest in the EU and the largest in Italy with an estimated population of about 5.2 million. As the main industrial, commercial and financial center of Italy, it has a metropolitan region that... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE
EU-GUGLE Site Sestao

EU-GUGLE Site Sestao

Sestao is a municipality located at 11 km from Bilbao, on the left bank of the River, with a strong postindustrial character. It has an area of 3.5 km2 where only 0.9 km2 are devoted to residential use and the rest is used for industrial purposes. The demonstration district is located in the lower area of Sestao and it is the most affected by the... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE
EU-GUGLE Site Tampere

EU-GUGLE Site Tampere

Tampere is located on the banks of Tammerkoski rapids, between two lakes, Näsijärvi and Pyhäjärvi. It is the third biggest city and second biggest growth center in Finland, and the biggest inland city in the Nordic countries with 215,168 inhabitants. The EU-GUGLE demonstration takes place in Tammela, which is a sparsely built traditional... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE
EU-GUGLE Site Vienna

EU-GUGLE Site Vienna

The EU-GUGLE demonstration district in Vienna is named Penzing or the 14th district. The smart Viennese gate to western Austria and to the Natura 2000 area, the Biosphärenpark Wienerwald, covers about 3,374 hectares with a share of 60% on open space including parts of the forest surrounding Vienna. The district has about 84,362 inhabitants.... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: EU-GUGLE

R2CITIES Site Genoa

The social housing district of Lavatrici was developed during 1980-1990. The pilot is located on the west part of the city in the so called Pegli 3 District on a natural hill. The site consists of more than 500 dwellings. It is divided in four main blocks and each of them is composed by three different buildings: a high block, a lower block, and a... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: R2CITIES

R2CITIES Site Istanbul

The selected pilot site is located at Yakacik district of Kartal, Istanbul. The use of low efficiency lighting systems and appliances and a slim insulation means very high energy consumption for Yakacık and therefore a high potential for improving. The demonstration site aims to retrofit a residential district with efficient strategies. Passive... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: R2CITIES

R2CITIES Site Valladolid

A complete retrofitting based on façade improvements, ICTs and renewable energy systems will be implemented in the Cuatro de Marzo district, the demo site chosen for the R2CITIES project in Valladolid (Spain). The district Cuatro de Marzo is located in the south part of the Valladolid urban area. It was projected in 1955 as a residential area at... Continue reading
SCIS Clusters : Demonstration projects, Sustainable energy solutions on district level, District Revitalisation
Projects: R2CITIES